4.8 Alibaba Rating, Get a Quote in 2 Hours Activate now
Request a Free Physical Sample Find Us
FAQ
Yes, ODM and OEM orders are welcome.
Depending on the order quantity, small orders usually take 7-12 days, while larger orders require negotiation.
T/T, 30% deposit / 70% balance before shipment, Large negotiable amount.
For ready-to-ship items, the MOQ requirements are as listed (usually 100 pieces). You can place an order with the minimum quantity as indicated. For customized items, we accept orders of 500 pieces or more.
Please provide material, size, shape, color, quantity, surface finish, etc.
Yes, larger orders come with more favorable pricing.
AI, PDF, CDR, high-resolution JPG (over 300 DPI).
FSC-related documentation can be provided for applicable FSC-certified materials within the relevant certification scope. Because FSC requirements depend on the material selected for a particular project, buyers should confirm the requirement before production and make sure the material used for the order matches the agreed documentation.
The magnetic closure should be evaluated during sampling. The main checks include magnet placement, lid alignment, closing strength and ease of opening. The required magnet setup can change with the box size, board construction, lid weight and insert design. The goal is a closure that stays secure during normal handling without being unnecessarily difficult to open.
The most useful information is the finished box size, product dimensions, quantity, preferred structure, material requirements, artwork status, printing and finishing requirements, insert requirements and shipping destination. If some details are not available yet, send the information you already have. A packaging manufacturer can review the project and identify the missing specifications before preparing the final quotation.
Yes. You do not need to have a finished dieline to start a packaging project. Product dimensions, product photos, a reference box or a physical product sample can provide a starting point for structural development. The final structure should be confirmed through the prototype before mass production.


Blog Sitemap Xml Privacy Policy
Copyright © 2026 GuangZhou GooinPack Packaging Co., Ltd. All Rights Reserved.
Network Supported
Friendly Links: Blogger
Leave A Message
Scan to WhatsApp :